Home > NRC Library > ADAMS Public Documents
Virgil C. Summer Nuclear Station Unit 1 - Submittal of Final Safety Analysis Report Updated Through May 31, 2019.
Accession Number: ML19255F498
Date Released: Tuesday, October 29, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19261A144 - Virgil C. Summer Nuclear Station Unit 1 - Submittal of Final Safety Analysis Report Updated Through May 31, 2019. (9 page(s), 8/26/2019)
- ML19255F380 - V.C. Summer Nuclear Station - Updated Final Safety Analysis Report. (1 page(s), 5/31/2019)
- ML19255F409 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (148 page(s), 5/31/2019)
- ML19255F412 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 2, Site Characteristics. (1025 page(s), 5/31/2019)
- ML19255F432 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-77. (1 page(s), 5/31/2019)
- ML19255F434 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-78. (1 page(s), 5/31/2019)
- ML19255F436 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-79. (1 page(s), 5/31/2019)
- ML19255F430 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-3. (1 page(s), 5/31/2019)
- ML19255F418 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.4-6. (1 page(s), 5/31/2019)
- ML19255F421 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-10. (1 page(s), 5/31/2019)
- ML19255F423 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-13. (1 page(s), 5/31/2019)
- ML19255F425 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-25. (1 page(s), 5/31/2019)
- ML19255F415 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.1-26. (1 page(s), 5/31/2019)
- ML19255F427 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 2.5-27. (1 page(s), 5/31/2019)
- ML19255F443 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figures 2E-1 through 2E-90. (105 page(s), 5/31/2019)
- ML19255F446 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figures 2F-2 through 2F-86. (85 page(s), 5/31/2019)
- ML19255F485 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems. (810 page(s), 5/31/2019)
- ML19255F488 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 4, Reactor. (283 page(s), 5/31/2019)
- ML19255F491 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System. (303 page(s), 5/31/2019)
- ML19255F495 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (566 page(s), 5/31/2019)
- ML19255F499 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (288 page(s), 5/31/2019)
- ML19255F503 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 8, Electric Power. (251 page(s), 5/31/2019)
- ML19255F507 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (341 page(s), 5/31/2019)
- ML19255F604 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figures 9.2-1 through F9.2-24. (23 page(s), 5/31/2019)
- ML19255F612 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figures 9.4-1 through 9.4-36. (44 page(s), 5/31/2019)
- ML19255F510 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (142 page(s), 5/31/2019)
- ML19255F512 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (181 page(s), 5/31/2019)
- ML19255F514 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (163 page(s), 5/31/2019)
- ML19255F590 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figure 12.1-8. (1 page(s), 5/31/2019)
- ML19255F517 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (69 page(s), 5/31/2019)
- ML19255F520 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation. (155 page(s), 5/31/2019)
- ML19255F523 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 15, Accident Analyses. (442 page(s), 5/31/2019)
- ML19255F525 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (2 page(s), 5/31/2019)
- ML19255F528 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (52 page(s), 5/31/2019)
- ML19255F531 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities. (31 page(s), 5/31/2019)
- ML19255F650 - Approved FSAR Revision Notices Incorporated Since May 2018 Update -Effective May 31, 2019. (6 page(s), 5/31/2019)
- ML19298C329 - Virgil C. Summer Unit 1 Updated Final Safety Analysis Report, Figures 9.5-1 through 9.5-11 (Redacted File) (24 page(s), 10/30/2018)