Home > NRC Library > ADAMS Public Documents
Forwards three technical reviews of DES including reviews of economic analysis of alternatives,NUREG-0529,need for plant, cost - benifit summary & environ impacts of plant operation.
Accession Number: ML19253A572
Date Released: Tuesday, September 24, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19253A571 - Forwards three technical reviews of DES including reviews of economic analysis of alternatives,NUREG-0529,need for plant, cost - benifit summary & environ impacts of plant operation. (1 page(s), 8/29/1979)
- ML19253A573 - "Review of Economic Analysis of Alternatives for Facilities as Set Forth in DES of NRC,May 1979 (NUREG-0529)." (20 page(s), 5/31/1979)
- ML19253A574 - "Review of NUREG-0529 Need for Plant (Chapter 8) Benefit-Cost Summary (Sections 10.4,10.5)." (11 page(s), 8/29/1979)
- ML19253A575 - "Review,Chapter 5 - Environ Impacts of Plant Operation (Specifically 5.3 & 5.5) of DES,NUREG-0529,May 1979." (22 page(s), 5/31/1979)