NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards final deficiency rept on breakdown in QC program at Industrial Engineering Works re reactor pressure vessel shield wall.Initial & interim repts submitted on 790417 & 0517,respectively.

Accession Number: ML19249E396

Date Released: Friday, September 20, 2019

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer