Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for records re repair work done Dec 1973-Feb 1974.Forwards several documents.Remaining documents in PDR,Washington,DC & LPDR,Rochester,NY.
Accession Number: ML19249E126
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19249E125 - Responds to FOIA request for records re repair work done Dec 1973-Feb 1974.Forwards several documents.Remaining documents in PDR,Washington,DC & LPDR,Rochester,NY. (2 page(s), 9/24/1979)
- ML19249E127 - Forwards RO 73-11. (1 page(s), 12/21/1973)
- ML19249E131 - RO 73-11:on 731214,during auxiliary feedwater sys flow test, no pressure or flow indication given that auxiliary feedwater pump stopped.Pump vented.Pump A flow test completed successfully. (6 page(s), 12/21/1973)
- ML19249E132 - Forwards RO 74-01. (1 page(s), 1/28/1974)
- ML19249E133 - RO 74-01:on 740118,during removal of manway cover & insert from steam generator A hot leg section,rush of air to steam generator A caused pressure imbalance in steam generator water still.Personnel exposure determined. (2 page(s), 1/28/1974)
- ML19249E135 - Forwards RO 74-02. (1 page(s), 2/19/1974)
- ML19249E136 - RO 74-02:refueling outage required eddy current testing of steam generator tubes.Test results to date indicate wastage problem to be localized & more severe in steam generator A hot leg.No primary or secondary leakage in generators. (4 page(s), 2/7/1974)
- ML19249E137 - Forwards RO 74-03. (1 page(s), 2/22/1974)
- ML19249E147 - RO 74-03:on 790214,during pressure decay test of containment purge supply & exhaust damper vols to determine damper leakage,excessive leakage rate obtained from supply & exhaust test vols.Repairs will be made prior to refueling. (3 page(s), 2/22/1974)