Millstone, Units 2 and 3 and Independent Spent Fuel Storage Installation (ISFSI); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6...
Accession Number: ML19249B779
Date Released: Monday, September 30, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19249B764 - Millstone, Units 2 and 3 and Independent Spent Fuel Storage Installation (ISFSI); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6... (5 page(s), 8/29/2019)
- ML19249B767 - Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs. (86 page(s), 8/29/2019)
- ML19249B768 - Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated). (542 page(s), 8/29/2019)
- ML19249B772 - Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated). (267 page(s), 8/29/2019)
- ML19249B774 - Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated). (252 page(s), 8/29/2019)
- ML19249B776 - Enclosure 6 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of Calculations. (55 page(s), 8/29/2019)
- ML19249B778 - Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS POT. LOSS A.1. (2 page(s), 8/29/2019)