Home > NRC Library > ADAMS Public Documents
Forwards application for amend to License DPR-40 to permit Cycle 6 operation following core reload at increased power level of 1,500 MW.Certificate of Svc & Class 5 amend fee determination encl.
Accession Number: ML19246B769
Date Released: Tuesday, September 17, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19246B768 - Forwards application for amend to License DPR-40 to permit Cycle 6 operation following core reload at increased power level of 1,500 MW.Certificate of Svc & Class 5 amend fee determination encl. (3 page(s), 7/17/1979)
- ML19246B772 - Application for amend to License DPR-40 to increase thermal power level to 1,500 MW,commencing w/Cycle 6 operation following core reload. (2 page(s), 7/13/1979)
- ML19246B776 - Application for amend to License DPR-40 to permit Cycle 6 operation following core reload. (2 page(s), 7/13/1979)
- ML19246B780 - Environ assessment re consequences of proposed increase in thermal power level to 1,500 MW. (195 page(s), 7/17/1979)
- ML19246B788 - "LOCA Analyses at 1,500 MW Using Exxon Nuclear Co WREM-IIA PWR ECCS Evaluation Model,Large Break Example Problem." (59 page(s), 5/29/1979)
- ML19246B794 - "Exxon Nuclear Co Setpoint Methodology for C-E Reactors." (59 page(s), 6/25/1979)