Responds to ASLB 791130 order directing NRC to inform ASLB of unresolved problems w/hearing on seismic issues.Forwards KS Herring,Cm Trammell,F Clemeson & JE Knight affidavits.
Accession Number: ML19211A227
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19211A226 - Responds to ASLB 791130 order directing NRC to inform ASLB of unresolved problems w/hearing on seismic issues.Forwards KS Herring,Cm Trammell,F Clemeson & JE Knight affidavits. (3 page(s), 12/7/1979)
- ML19211A230 - Affidavit of KS Herring on unsolved problems,viewed from safety standpoint,re adequacy of control bldg mods to bring facility into substantial compliance w/license.Statement of professional qualifications encl. (7 page(s), 12/7/1979)
- ML19211A234 - Affidavit of KS Herring re effects of mod work on plant safety.Statement of prof qualifications encl. (5 page(s), 12/7/1979)
- ML19211A236 - Affidavit of CM Trammell re ability of control room ventilation sys to maintain control room at positive pressure of 0.125-inch water column relative to outside atmosphere.Prof qualifications encl. (4 page(s), 12/7/1979)
- ML19211A240 - Affidavit of F Clemenson re control of const-generated dust & const work involved in floor slab & wall removal.Prof qualifications encl. (7 page(s), 12/7/1979)
- ML19211A243 - Affidavit of JE Knight re fire protection for wood framing & other combustible matls,protection of cables from dropped objects & effects of drilling through control bldg west wall.Prof qualifications encl. (6 page(s), 12/7/1979)
- ML19211A247 - Affidavits of CM Trammell & KS Herring re piping & equipment supports & walls & seismic designs.Prof qualifications encl. (6 page(s), 12/7/1979)