Home > NRC Library > ADAMS Public Documents
Inspection Workshop Summary.
Accession Number: ML19087A256
Date Released: Friday, April 5, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19086A059 - 11/15/18 Summary of Public Meeting with Nuclear Energy Institute regarding an Inspection Workshop related to Digital Instrumentation and Controls Modifications. (6 page(s), 4/2/2019)
- ML18312A333 - 11/15/2018 Inspection Workshop (2 page(s), 11/8/2018)
- ML19085A447 - Inspection of Digital Instrumentation and Control Installations Approved under the Guidance of ISG-06 / Inspection Workshop 11-16-18. (201 page(s), 3/27/2019)
- ML19085A483 - Tabletop Exercise of Interim Staff Guidance (ISG)-06, Draft Rev. 2, "Licensing Process"Tabletop (Transcript Day 1). (267 page(s), 6/13/2018)
- ML19085A484 - Tabletop Exercise of Interim Staff Guidance(ISG)-06, Draft Rev. 2, "Licensing Process" Tabletop (Transcript Day 2). (136 page(s), 6/14/2018)
- ML18319A015 - General Roles and Responsibilites -November 15, 2018 Inspection Workshop (15 page(s), 11/15/2018)
- ML18319A017 - Audit and Inspection Example 11.15.18 Inspection Workshop. (11 page(s), 11/15/2018)
- ML18302A036 - Meeting Slide for MP4a Draft ISG-06 Rev. 2 NRC Inspection Workshop - Industry Expectations on Alternate Review Process Inspections. (15 page(s), 11/15/2018)
- ML18317A202 - NEI Tabletop VOP Summary for Inspection Workshop - November 15, 2018 (9 page(s), 11/13/2018)
- ML19087A230 - Implementation and Design Output Criterion. (7 page(s), 3/28/2019)