Home > NRC Library > ADAMS Public Documents
Beaver Valley, Unit 2, 180-Day Steam Generator Tube Inspection Report.
Accession Number: ML19087A050
Date Released: Friday, April 5, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19087A051 - Beaver Valley, Unit 2, Submittal of 180-Day Steam Generator Tube Inspection Report. (14 page(s), 3/28/2019)
- ML19087A052 - Attachment A: Beaver Valley, Unit 2, 2R20 Steam Generator Examination Results 2RCS-SG21B (Tubes with Service Induced Indications). (31 page(s), 3/28/2019)
- ML19087A053 - Attachment B: Beaver Valley, Unit 2, 2R20 Steam Generator Examination Results 2RCS-SG21B (Tubes with Service Induced Indications). (20 page(s), 3/28/2019)
- ML19087A056 - Attachment C: Beaver Valley, Unit 2, 2R20 Steam Generator Examination Results 2RCS-SG21C (Tubes with Service Induced Indications). (22 page(s), 3/28/2019)