Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 3 and 4 - Issuance of Amendments 154/153 and Granting of Exemptions RE: Administrative Changes to Align Initial Test Program with Regulatory Guide 1.68 (LAR-18-024) (EPID L-2018-LLA-0237)
Accession Number: ML19035A755
Date Released: Monday, March 4, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19035A756 - Vogtle Electric Generating Plant Units 3 and 4 (LAR-18-024) Cover Letter - Administrative Changes to Align Initial Test Program with Regulatory Guide 1.68. Amendment 154/153. (4 page(s), 2/22/2019)
- ML19035A757 - Vogtle Electric Generating Plant, Unit 3 Amendment 154 LAR-18-024. (2 page(s), 2/22/2019)
- ML19035A758 - Vogtle Electric Generating Plant, Unit 3 Attachment for Amendment 154 - LAR-18-024. (4 page(s), 2/22/2019)
- ML19035A759 - Vogtle Electric Generating Plant, Unit 4 Amendment 153 LAR-18-024 (2 page(s), 2/22/2019)
- ML19035A760 - Vogtle Electric Generating Plant, Unit 4 Attachment for Amendment 153 - LAR-18-024 (4 page(s), 2/22/2019)
- ML19035A761 - Vogtle Electric Generating Plant, Unit 3 Exemption - LAR-18-024. (2 page(s), 2/22/2019)
- ML19035A762 - Vogtle Electric Generating Plant, Unit 4 Exemption - LAR-18-024 (2 page(s), 2/22/2019)
- ML19035A763 - Vogtle Electric Generating Plant Units 3 and 4 (LAR-18-024) Safety Evaluation - Administrative Changes to Align Initial Test Program with Regulatory Guide 1.68. Amendments 154/153. (6 page(s), 2/22/2019)