Home > NRC Library > ADAMS Public Documents
Crystal River, Unit 3 - Partial Site Release Request.
Accession Number: ML19029A018
Date Released: Thursday, February 14, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19022A076 - Crystal River, Unit 3 - Partial Site Release Request. (44 page(s), 1/22/2019)
- ML19029A003 - Reference 1 - Duke Energy Crystal River Plant Descriptions (SurvTech Solutions). (19 page(s), 7/18/2018)
- ML003761445 - NUREG-1575, Rev. 1 - 01 "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)" (360 page(s), 8/31/2000)
- ML003761454 - NUREG-1575, Rev. 1 - 02 "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)" (290 page(s), 8/31/2000)
- ML19029A010 - Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00. (221 page(s), 6/28/2016)
- ML061870462 - NUREG-1505, Rev 1, "A Nonparametric Statistical Methodology for the Design and Analysis of Final Status Decommissioning Surveys." (245 page(s), 6/30/1998)
- ML19029A011 - Reference 5 - EPA-600-R-07-020, "Performance of Statistical Tests for Site Versus Background Soil Comparisons When Distributional Assumptions Are Not Met." (56 page(s), 3/31/2007)
- ML063000252 - 2006/10/31 - Pre-filed Staff Exhibit 21 - NUREG-1757 Vol 2 Rev 1 "Consolidated Decommissioning Guidance: Characterization, Survey, and Determination of Radiological Criteria" Final Report (546 page(s), 10/31/2006)
- ML19029A009 - Reference 16 - Defueled Safety Analysis Report DSAR-R002. (321 page(s), 11/7/2018)
- ML091520178 - Final Environmental Statement Related to the Proposed Crystal River Unit 3, Florida Power Corporation, Docket No. 50-302, May 1973, US Atomic Energy Commission. (404 page(s), 5/31/1973)