- ML18360A478 - Attachment 10: HEP Evaluation Related to Shutdown Cooling Isolation (4 page(s), 12/14/2018)
- ML18360A479 - Attachment 11: Procedures and Training Material on Maintaining RPV Pressure Low. (361 page(s), 12/14/2018)
- ML18360A480 - Attachment 12: Time Validation - Performance of Division 3 DG to Division 2 Bus Cross-tie. (1 page(s), 12/14/2018)
- ML18360A481 - Attachment 13: Simulator Exercise Guide SE-JIT-42, "Loss of AC, Loss of SDC and Lowering RPV Level," Rev 1. (18 page(s), 12/14/2018)
- ML18360A482 - Attachment 14: CPS Procedure 4200.01 C002, "DC Load Shedding During a 580," Rev 5a. (7 page(s), 12/14/2018)
- ML18360A483 - Attachment 15: FLEX and Cross-tie Training Material. (312 page(s), 12/14/2018)
- ML18360A484 - Attachment 16: Graph of RPV Water Level. (1 page(s), 12/14/2018)
- ML18360A485 - Attachment 17: Inconsistencies Between FLEX SE and Choice Letter Assumptions. (5 page(s), 12/14/2018)
- ML18360A469 - Attachment 1: Summary of Exelon Position. (22 page(s), 12/14/2018)
- ML18360A470 - Attachment 2: Response to NRC Questions and Documentation Requests. (14 page(s), 12/14/2018)
- ML18360A471 - Attachment 3: EC 626319, "Battery Coping Time Evaluation to Support Inadvertent Isolation of Div. II Air Start Receiver Valves" (447 page(s), 12/14/2018)
- ML18360A472 - Attachment 4: Training Material on Diesel Generator Malfunctions (467 page(s), 12/14/2018)
- ML18360A473 - Attachment 5: Senior Reactor Operator Surveys. (50 page(s), 12/14/2018)
- ML18360A474 - Attachment 6: CPS Shift Manager Surveys Regarding ELAP Scenarios. (13 page(s), 12/14/2018)
- ML18360A475 - Attachment 7: Time Validation - Performance of SBO and Starting of Division 2 Diesel Generator. (3 page(s), 12/14/2018)
- ML18360A476 - Attachment 8: 2017 Training Material on Diesel Generator Air Start Flow Plow. (162 page(s), 12/14/2018)
- ML18360A477 - Attachment 9: Procedures on Shutdown Cooling Isolation. (191 page(s), 12/14/2018)
- ML18360A468 - Clinton Power Station, Unit 1 - Exelon Evaluation of Preliminary White Finding. (4 page(s), 12/14/2018)