Home > NRC Library > ADAMS Public Documents
Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Submittal of Revision 17 to Updated Final Safety Analysis Report and Amendment 28 to Updated Fire Protection Report.
Accession Number: ML18355A456
Date Released: Friday, June 21, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18355A447 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Submittal of Revision 17 to Updated Final Safety Analysis Report and Amendment 28 to Updated Fire Protection Report. (14 page(s), 12/17/2018)
- ML18355A418 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Cover and Page Index. (140 page(s), 12/17/2018)
- ML18355A419 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (63 page(s), 12/17/2018)
- ML18355A425 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (262 page(s), 12/17/2018)
- ML18355A427 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (420 page(s), 12/17/2018)
- ML18355A431 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (157 page(s), 12/17/2018)
- ML18355A432 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (214 page(s), 12/17/2018)
- ML18355A434 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (36 page(s), 12/17/2018)
- ML18355A436 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program. (142 page(s), 12/17/2018)
- ML18355A438 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (12 page(s), 12/17/2018)
- ML18355A439 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (2 page(s), 12/17/2018)
- ML18355A440 - Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Appendix A - Application of NRC Regulatory Guides. (319 page(s), 12/17/2018)
- ML18355A442 - Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Appendix B - Construction Material Standard and Quality Control Procedures. (68 page(s), 12/17/2018)
- ML18355A443 - Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Appendix C Has been Intentionally Deleted. (1 page(s), 12/17/2018)
- ML18355A503 - Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Appendix D - Computer Programs. (188 page(s), 12/17/2018)
- ML18355A506 - Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Appendix F - Updated Final Safety Analysis Report Supplement (License Renewal). (144 page(s), 12/17/2018)
- ML18355A542 - Braidwood Station, Units 1 & 2, Revision 100 to Technical Requirements Manual. (310 page(s), 12/17/2018)
- ML18355A545 - Byron Station, Units 1 & 2, Revision 125 to Technical Requirements Manual. (611 page(s), 12/17/2018)
- ML18355A541 - Braidwood Station, Units 1 & 2, Rev. 120 to Technical Specifications Bases (TS Bases). (851 page(s), 12/17/2018)
- ML18355A543 - Byron Station, Units 1 & 2, Revision 111 to Technical Specification Bases (TS Bases). (855 page(s), 12/17/2018)
- ML18355A548 - Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report Cover and Page Index. (40 page(s), 12/17/2018)
- ML18355A549 - Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Chapter 1.0 Introduction. (5 page(s), 12/17/2018)
- ML18355A556 - Braidwood Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Chapter 3.0 Braidwood Guidelines of BTP CMEB 9.5-1. (198 page(s), 12/17/2018)
- ML18355A557 - Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Chapter 3.0 Byron Guidelines of BTP CMEB 9.5-1. (169 page(s), 12/17/2018)
- ML18355A558 - Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Chapter 4, Fire Protection Program. (2 page(s), 12/17/2018)
- ML19170A347 - Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis (739 page(s), 6/20/2019)
- ML19170A387 - Redacted Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (315 page(s), 6/19/2019)
- ML19170A384 - Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 - Revision 17 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (706 page(s), 6/19/2019)
- ML19170A336 - Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (163 page(s), 6/19/2019)
- ML19170A012 - Redacted Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 - Revision 17 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (654 page(s), 6/19/2019)
- ML19170A007 - Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 -Redacted Revision 17 to Updated Final Safety Analysis Report, Chapter 4, Reactor (309 page(s), 6/19/2019)
- ML19170A316 - Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (1430 page(s), 6/19/2019)
- ML19169A342 - Redacted Byron Station, Units 1 and 2 -Revision 17 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (1129 page(s), 6/18/2019)
- ML19169A114 - Redacted Braidwood Station, Units 1 and 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (1274 page(s), 6/18/2019)
- ML19169A023 - Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 -Amendment to Fire Protection Report, Chapter 2.0 - 2.3, Area (Public version pages 1-26, 43-103, and 134) (88 page(s), 6/18/2019)
- ML19170A311 - Redacted Braidwood Station, Units 1 & 2, and Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Appendix 5.1 (Public Version Pages 1-76 and 129-287) (235 page(s), 6/19/2019)
- ML19169A113 - Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Appendix E - Requirements Resulting from TMI-2 Accident (Public version pages 1-173 and 258-277) (193 page(s), 6/18/2019)
- ML19168A216 - Redacted Byron Station, Units 1&2, Amendment 28 to Fire Protection Report, Chapter 2.4, Safe Shutdown Analysis (Public Version Pages 1-20 and 1626-1643) (38 page(s), 6/17/2019)
- ML19168A119 - Redacted Braidwood Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Chapter 2.4, Safe Shutdown Analysis. (Public version pages 1-19 and 1726-1742) (36 page(s), 6/17/2019)