Home > NRC Library > ADAMS Public Documents
Donald C. Cook Nuclear Plant, Units 1 & 2 - Request for License Amendment to Technical Specification 3.4.15, "RCS Leakage Detection Instrumentation," and Application of Leak-Before-Break Methodology.
Accession Number: ML18334A291
Date Released: Monday, December 10, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18334A267 - Donald C. Cook Nuclear Plant, Units 1 & 2 - Request for License Amendment to Technical Specification 3.4.15, "RCS Leakage Detection Instrumentation," and Application of Leak-Before-Break Methodology. (113 page(s), 11/20/2018)
- ML18334A268 - WCAP-18295-NP, Revision 0, "Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology" (Non-Proprietary). (63 page(s), 1/31/2018)
- ML18334A269 - WCAP-18302-NP, Revision 0, "Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology." (50 page(s), 1/31/2018)
- ML18334A270 - WCAP-18309-NP, Revision 0, "Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis for D.C. Cook, Units 1 and 2, Using Leak-Before-Break Methodology." (74 page(s), 1/31/2018)
- ML18334A271 - WCAP-18394-NP, Revision 1, "Fatigue Crack Growth Evaluations of D.C. Cook, Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break." (19 page(s), 9/30/2018)
- ML18334A272 - LTR-SDA-II-18-41-NP, Revision 1, "Responses to NRC Questions on the Expanded Scope Leak-Before-Break Evaluations for D.C. Cook, Units 1 and 2." (10 page(s), 9/18/2018)