Submittal of Turkey Point Units 3 and 4 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI} Set 4 Responses.
Accession Number: ML18299A214
Date Released: Monday, November 5, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18299A114 - Turkey Point Units 3 and 4 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI} Set 4 Responses. (90 page(s), 10/24/2018)
- ML18299A115 - Environmentally Assisted Fatigue Evaluation of the Turkey Point Unit 3 and Unit 4 Pressurizer Upper Head and Shell and Reactor Vessel Core Support Blocks. (4 page(s), 9/14/2018)
- ML18299A116 - Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - REDACTED, "Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal. (61 page(s), 10/15/2018)
- ML18299A117 - Framatome Calculation No. 32-9280712, Rev. 002, TP CRDM Lower Joint Environmentally Assisted Fatigue" dated October 12, 2018 (Non-Proprietary). (33 page(s), 10/12/2018)
- ML18299A118 - Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, "Fatigue Crack Growth Evaluation," October 12, 2018. (73 page(s), 10/12/2018)
- ML18299A119 - Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, "Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines". (85 page(s), 10/12/2018)