North Anna Power Station, Units 1 & 2, Submittal of Revision 54 to Updated Final Safety Analysis Report.
Accession Number: ML18285A084
Date Released: Thursday, January 14, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18285A046 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Frontmatter - Revision Summary. (118 page(s), 9/27/2018)
- ML18285A047 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (86 page(s), 9/27/2018)
- ML18285A048 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics. (526 page(s), 9/27/2018)
- ML18285A049 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment, and Systems. (1426 page(s), 9/27/2018)
- ML18285A050 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 4, Reactor. (354 page(s), 9/27/2018)
- ML18285A051 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System. (438 page(s), 9/27/2018)
- ML18285A052 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (404 page(s), 9/27/2018)
- ML18285A053 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control. (232 page(s), 9/27/2018)
- ML18285A054 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System. (82 page(s), 9/27/2018)
- ML18285A055 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (424 page(s), 9/27/2018)
- ML18285A056 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (110 page(s), 9/27/2018)
- ML18285A057 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (362 page(s), 9/27/2018)
- ML18285A058 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (104 page(s), 9/27/2018)
- ML18285A059 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (20 page(s), 9/27/2018)
- ML18285A060 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation. (76 page(s), 9/27/2018)
- ML18285A061 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses. (494 page(s), 9/27/2018)
- ML18285A062 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Requirements. (10 page(s), 9/27/2018)
- ML18285A063 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program. (4 page(s), 9/27/2018)
- ML18285A064 - North Anna Power Station, Units 1 & 2, Revision 54 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging. (48 page(s), 9/27/2018)