Home > NRC Library > ADAMS Public Documents
Fenoc Fleet-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1, Exemption from the Requirements of 10 CFR Part 73, Section 73.2
Accession Number: ML18171A332
Date Released: Wednesday, September 12, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18171A334 - Fenoc Fleet-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1, Exemption from the Requirements of 10 CFR Part 73, Section 73.2 (12 page(s), 9/6/2018)
- ML18171A342 - FENOC Fleet, Individual Exemption FR Notice for Publication (EPID-L-2017-LLE-0019, CAC Nos. MG0010, MG0011, MG0012, and MG0013) RE: Exemption-Definition of Physical Barrier-Physical Security Plans For Beaver Valley 1 & 2, David-Besse, and Perry. (10 page(s), 9/6/2018)
- ML18178A588 - FENOC Fleet - Individual FR Notice - Notice of Issuance of Exemption re: Exemption from the Definition of Physical Barrier. (12 page(s), 9/6/2018)