Home > Site Help > Search Results

Forwards Technical Rept PE-0005,Rev 1, "Evaluation of Flooding of Incore Instrumentation Room Surry Power Station Unit 1," as result of 880517 leak from refueling cavity.Rept identifies potential effects of borated water flooding.

Accession Number: ML18152B190

Date Released: Monday, December 10, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer