Home > NRC Library > ADAMS Public Documents
Beaver Valley; Davis-Besse; Perry - Environmental Assessment and Finding of No Significant Impact Related to Exemption Request for a Physical Barrier Requirement (EPID L-2017-LLE-0019)
Accession Number: ML18130A889
Date Released: Thursday, September 6, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18130A885 - FENOC Fleet - Beaver Valley; Davis-Besse; Perry - Environment Assessment and Finding of No Significant Impact Related to Exemption Request for a Physical Barrier Requirement (CAC Nos. MG0010, MG0011, MG0012, and MG0013; EPID L-2018-LLE-0019) (31 page(s), 8/29/2018)
- ML18130A760 - Beaver Valley Power Station, Units 1 and 2 - First Energy Operating Company (FENOC) FirstEnergy Nuclear Generation, LLC, Beaver Valley Power Station, Units 1 and 2 (8 page(s), 9/4/2018)
- ML18130A849 - Davis-Besse Nuclear Power Station, Unit 1 - FirstEnergy Nuclear Operating Company (FENOC); FirstEnergy Nuclear Generation, LLC; Environmental Assessment (9 page(s), 9/4/2018)
- ML18130A820 - Perry Nuclear Power Plant Unit No. 1 - FirstEnergy Nuclear Operating Company (FENOC); FirstEnergy Nuclear Generation Company, LLC - Environmental Assessment. (8 page(s), 9/4/2018)