Home > NRC Library > ADAMS Public Documents
Submits addl info re implementation of short-term Lessons Learned requirements.Status of remaining Category A items, mid-yr status of design & installation of Category B mods & schedule for implementation encl.Forwards drawings.
Accession Number: ML18130A287
Date Released: Monday, December 10, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18130A286 - Submits addl info re implementation of short-term Lessons Learned requirements.Status of remaining Category A items, mid-yr status of design & installation of Category B mods & schedule for implementation encl.Forwards drawings. (180 page(s), 7/7/1980)
- ML18130A290 - "Flow Diagram:Boron Recovery Sys." Sheet 1. (1 page(s), 7/7/1980)
- ML18130A314 - "General Arrangement:High Radiation Sampling Sys Waste Tank & Pumps Plan,Elevation 27 Ft,6 Inches & Section." Sheet 1. (1 page(s), 5/29/1980)
- ML18130A305 - "P&ID:Liquid Sampling Panel." Sheet 4 of 5. (1 page(s), 5/5/1980)
- ML18130A297 - "Process Flow Diagram:Containment Air Sampling." (1 page(s), 4/14/1980)
- ML18130A294 - "P&ID:Liquid Sampling." 5 of 5. (1 page(s), 5/5/1980)
- ML18130A296 - "Process Flow Diagram:Liquid Sampling." Sheet 2 of 2. (1 page(s), 5/22/1980)
- ML18139A420 - "P&ID:Containment & Air Sampling Sys." Sheet 1 of 1. (1 page(s), 5/5/1980)
- ML18130A298 - "General Arrangement:Auxiliary Bldg,Drumming Room Plan, Elevation 274 Ft." Sheet 1. (1 page(s), 5/29/1980)
- ML18130A311 - "Process Flow Diagram:Containment Air Sampling." Sheet 1 of 1. (1 page(s), 4/14/1980)
- ML18130A303 - "P&ID:Liquid Sampling." Sheet 2 of 5. (1 page(s), 5/5/1980)
- ML18130A295 - "Process Flow Diagram:Liquid Sampling." Sheet 1 of 2. (1 page(s), 5/22/1980)
- ML18139A419 - "P&ID:Liquid Sampling Panel." Sheet 4 of 5. (1 page(s), 5/5/1980)
- ML18130A304 - "P&ID:Liquid Sampling Program." Sheet 3 of 5. (1 page(s), 5/5/1980)
- ML18130A301 - "P&ID:Liquid Sampling." Sheet 1 of 5. (1 page(s), 5/5/1980)
- ML18130A288 - "Sump Pump Discharge Piping:Auxiliary Bldg to Containment." (1 page(s), 5/15/1979)
- ML18130A300 - "General Arrangement:High Radiation Sampling Sys Waste Tank & Pumps,Plan Elevation 244 Ft,6 Inches & Section." Sheet 1. (1 page(s), 5/29/1980)
- ML18139A418 - "P&ID:Liquid Sampling Coolers." Sheet 3 of 5. (1 page(s), 5/5/1980)
- ML18130A308 - "P&ID:Containment Air Sampling Sys." Sheet 1 of 1. (1 page(s), 5/5/1980)
- ML18139A417 - "P&ID:Liquid Sampling." Sheet 2 of 5. (1 page(s), 2/19/1980)
- ML18130A292 - "Flow Diagram:Waste Disposal Sys." Sheet 2. (1 page(s), 7/7/1980)
- ML18139A421 - "General Arrangement:Auxiliary Bldg,Drumming Room,Section & Details." Sheet 2. (1 page(s), 5/29/1980)
- ML18130A289 - "Sump Pump Discharge Piping:Auxiliary Bldg to Containment." (1 page(s), 10/24/1977)
- ML18130A306 - "P&ID:Liquid Sampling Panel." Sheet 5 of 5. (1 page(s), 5/5/1980)
- ML18139A416 - "P&ID:Liquid Sampling." Sheet 1 of 5. (1 page(s), 5/5/1980)
- ML18130A293 - "Flow Diagram:Waste Disposal Sys." Sheet 1. (1 page(s), 7/7/1980)
- ML18130A313 - "General Arrangement:Auxiliary Bldg,Drumming Room,Section & Details." Sheet 2. (1 page(s), 5/29/1980)
- ML18139A415 - "Ventilation:Thermal Recombiner." (1 page(s), 4/7/1980)
- ML18130A312 - "General Arrangement:Auxiliary Bldg,Drumming Room Plan, Elevation 27 Ft,6 Inches." Sheet 1. (1 page(s), 5/29/1980)
- ML18130A310 - "Process Flow Diagram:Liquid Sampling." Sheet 2 of 2. (1 page(s), 5/22/1980)
- ML18130A291 - "Flow Diagram:Containment Atmosphere Cleanup Sys." (1 page(s), 10/22/1977)