NRC Logo

Home > NRC Library > ADAMS Public Documents

Ack receipt of VA congressional delegation 790319 ltr re shutdown of facilities.Steps have been taken re review of pipe stress reanalyses.Discusses site-specific consideration for seismic events.

Accession Number: ML18114A667

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer