Home > NRC Library > ADAMS Public Documents
Vogtle, Units 3 and 4 - Transmittal of Notices of Uncompleted ITAAC 225-days Prior to Initial Fuel Load.
Accession Number: ML18107A128
Date Released: Wednesday, April 25, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18107A129 - Vogtle, Units 3 and 4 - Transmittal of Notices of Uncompleted ITAAC 225-days Prior to Initial Fuel Load. (4 page(s), 4/10/2018)
- ML18107A130 - Vogtle, Units 3 and 4 - Enclosure 1 to ND-18-0500, Completion Plan for Uncompleted ITAAC 3.3.00.07d.iib [Index Number 801]. (5 page(s), 4/10/2018)
- ML18107A131 - Vogtle, Units 3 and 4 - Enclosure 2 to ND-18-0500, Completion Plan for Uncompleted ITAAC 3.3.00.07d.iii.b [Index Number 804]. (3 page(s), 4/10/2018)
- ML18107A132 - Vogtle, Units 3 and 4 - Enclosure 3 to ND-18-0500, Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.b [Index Number 807]. (3 page(s), 4/10/2018)
- ML18107A133 - Vogtle, Units 3 and 4 - Enclosure 4 to ND-18-0500, Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.b [Index Number 810]. (3 page(s), 4/10/2018)