Home > NRC Library > ADAMS Public Documents
Responds to issues raised in 940511 ltr to Chairman Selin re restart of Salem Unit 1 & event that occurred on 940407.
Accession Number: ML18100B081
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18100B079 - Responds to issues raised in 940511 ltr to Chairman Selin re restart of Salem Unit 1 & event that occurred on 940407. (4 page(s), 5/14/1994)
- ML18100B082 - Discusses CAL 1-94-05,dtd 940408 re decision to dispatch AIT to review & evaluate circumstances related to Unit 1 reactor trip & safety injection that occurred on 940407. (5 page(s), 4/25/1994)
- ML18100B083 - Provides supplemental info to 940420 ltr outlining actions to be taken as result of investigation into 940407 unit 1 reactor trip & safety injections. (11 page(s), 4/29/1994)
- ML18100B085 - Forwards info addressing hardware issues,corrective actions, status & root cause determination for PORVs,pressurizer safety valves & associated piping structural integrity re 940407 Salem Unit 1 reactor trip & safety injection. (8 page(s), 5/10/1994)
- ML18100B086 - Provides addl info per 940511 NRC request,re actions that had to be taken or would be taken as result of investigation into 940407 Salem Unit 1 reactor trip & safety injection. (55 page(s), 5/13/1994)
- ML18100B087 - Requests that NRC impose max fine allowable on PSE&G re 940407 Salem Unit 1 reactor trip & safety injection. (4 page(s), 5/11/1994)