Home > NRC Library > ADAMS Public Documents
Monticello Nuclear Generating Plant - Response to Request for Additional Information Regarding Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (DSCs) 11 through 15.
Accession Number: ML18100A173
Date Released: Thursday, April 12, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18100A183 - Monticello Nuclear Generating Plant - Response to Request for Additional Information Regarding Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (DSCs) 11 through 15. (115 page(s), 4/5/2018)
- ML18100A185 - Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters. (30 page(s), 4/11/2013)
- ML18100A188 - Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination. (13 page(s), 4/11/2013)
- ML18100A190 - Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records. (52 page(s), 5/22/2014)
- ML18100A191 - Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of TriVis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel. (4 page(s), 1/30/2014)
- ML18100A193 - Enclosure 13 - TN Americas LLC Calculation 11042-0207, Revision 1, NUHOMS 61BTH Type 1 DSC ITCP and OTCP Maximum Weld Flaw Evaluation. (35 page(s), 4/5/2018)