NRC Logo

Home > NRC Library > ADAMS Public Documents

Requests discretionary enforcement from Tech Spec Action Statements 3.0.3 & 3.5.2(c) for Unit 2.Addl 4 h beyond 7 h hot standby requirement to stabilize plant at current power level requested.

Accession Number: ML18094B236

Date Released: Thursday, November 29, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer