Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for all records re NRC 841218 meeting w/Hydrogen Control Owners Group in Norwood,MA & containment model experiments at Sandia.Forwards documents listed in App A.
Accession Number: ML18092B591
Date Released: Wednesday, May 20, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20127M848 - Forwards "Quick-Look Rept,Low Pressure Testing of Large Steel Model," from 840928-1001. (3 page(s), 10/3/1984)
- ML20127M138 - "Containment Integrity Program," monthly rept for Jul & Aug 1982. (6 page(s), 9/20/1982)
- ML20127M129 - Forwards monthly status of June expenditures for containment integrity program.Projected expenditures for remainder of FY82 leaves little carryover into FY83. (30 page(s), 7/9/1982)
- ML20127M767 - Forwards slides & transparencies of photos of 1/8 scale steel model.List describing each photo included.W/o encl. (2 page(s), 8/20/1984)
- ML20127M595 - Forwards G Derbalian paper, "Three-Dimensional Finite Element Analysis of Scale Model Nuclear Containment Vessel," to be presented at ASME PVP conference on 840617-21 in San Antonio,TX. (2 page(s), 1/4/1984)
- ML20127M646 - Submits subjective interpretation of failure pressure values developed w/C Conley for several nuclear power plants. (5 page(s), 3/19/1984)
- ML20127M723 - "Containment Safety Margins Program," monthly ltr rept for June 1984. (13 page(s), 7/18/1984)
- ML20127M697 - "Containment Safety Margins Program," monthly ltr rept for May 1984. (20 page(s), 6/26/1984)
- ML20127M328 - Forwards revised summary of recommendations for containment penetration program.Revs include detailed consideration of temp & aging effects.Cost estimate also encl. (11 page(s), 12/20/1982)
- ML20127M433 - "Containment Integrity Program," monthly rept for Apr 1983. (4 page(s), 5/7/1983)
- ML20127M831 - Submits list of meetings held since Jan 1984 w/personnel from INEL,BNL,Ames & NRC. (2 page(s), 9/5/1984)
- ML20127M312 - "Containment Integrity Program," monthly rept for Nov 1982. (9 page(s), 12/20/1982)
- ML20127M247 - "Containment Integrity Program," monthly rept for Sept 1982. (5 page(s), 10/30/1982)
- ML20127M341 - "Containment Integrity Program," monthly rept for Dec 1982. Nov funding status rept encl. (6 page(s), 1/19/1983)
- ML20127M615 - "Containment Safety Margins Program," monthly ltr rept for Dec 1983. (6 page(s), 1/23/1984)
- ML20127M880 - Procedure 16000 8409, "Safe Operating Procedure for Tests of Large Containment Models at Containment Test Site." (90 page(s), 9/24/1984)
- ML20127M271 - Forwards summary of recommendations for containment penetration program. (6 page(s), 11/8/1982)
- ML20127M101 - Outlines accelerated schedule on containment margin program. Schedule moves completion date of separable component development & testing from FY86 to early FY85. (7 page(s), 5/12/1982)
- ML20127M522 - Discusses 830811 test of ring-stiffened Model SC-2.Model failed catastrophically during pressure step from 135 psig to 140 psig. (1 page(s), 8/30/1983)
- ML20127M747 - "Containment Safety Margins Program," monthly ltr rept for Jul 1984. (6 page(s), 8/6/1984)
- ML20127M114 - Forwards monthly status of Apr & May expenditures for containment integrity program.QA insp on steel sheets for models completed.Planning & preparation of workshop continuing. (5 page(s), 6/22/1982)
- ML20127M430 - Forwards "Quick-Look Rept,Test of Model SC-1,Containment Integrity Program." (38 page(s), 5/2/1983)
- ML20127M075 - Requests addl funding to assure containment safety margin program continuity for FY83,per 820503 telcon re possible delay in certain portions of program due to commitment procedures. (2 page(s), 5/3/1982)
- ML20127M928 - "Experiments On Containment Models Under Extreme Loading Conditions," monthly ltr rept for Oct & Nov 1984.Project previously entitled "Containment Safety Margins." (6 page(s), 12/20/1984)
- ML20127M815 - Discusses possibility of leakage due to tearing of steel shell around penetrations or other details of discontinuities,per 840727 penetrations program plan review meeting. (3 page(s), 8/30/1984)
- ML20127M634 - "Containment Safety Margins Program," monthly ltr rept for Jan & Feb 1984. (12 page(s), 3/12/1984)
- ML20127M500 - "Containment Safety Margins Program," monthly rept for Nov 1983. (6 page(s), 12/13/1983)
- ML20127M891 - Forwards "Quick Look Rept,Large Steel Model Test," from 841107-17. (21 page(s), 11/27/1984)
- ML20127M047 - Forwards monthly status of funding for safety margins of containments program.Outstanding contracts increased due to purchase of optical displacement measurement sys.Completion of fabrication of steel units still within projected dates. (8 page(s), 3/16/1982)
- ML20127M605 - "Three-Dimensional Finite Element Analysis of Scale Model Nuclear Containment Vessel." (37 page(s), 12/31/1983)
- ML20127M381 - "Containment Integrity Program," monthly rept for Mar 1983. (5 page(s), 5/2/1983)
- ML20127M486 - "Containment Safety Margins Program," monthly ltr rept for June,Jul & Aug 1983. (8 page(s), 9/26/1983)
- ML20127M470 - "Containment Safety Margins Program," monthly rept for Sept & Oct 1983. (8 page(s), 11/18/1983)
- ML20127M023 - Forwards info on current expenditures on safety margins for containment project.Total costs include both accumulated expenses & contracts & purchases still open at end of month. (19 page(s), 1/26/1982)
- ML20127M442 - "Containment Integrity Program," monthly rept for May 1983. (8 page(s), 7/7/1983)
- ML20127M281 - "Containment Integrity Program," monthly rept for Oct 1982. (7 page(s), 11/11/1982)
- ML20127M458 - Discusses pressurized failure of Model SC-0 on 821212. Damage to testing equipment currently being assessed.Mods reducing damage during future testing considered. (2 page(s), 12/14/1982)
- ML20127M794 - Forwards seven abstracts submitted by Sandia & Argonne for 1985 SMiRT conference re NRC containment integrity programs & pressure experiments w/steel & concrete containment models. (17 page(s), 8/23/1984)
- ML20127M060 - Forwards monthly status of Mar expenditures & open contracts for safety margins of containments program.Costs will remain high through Apr & May due to fabrication of steel models. Fabrication schedule remains as projected. (4 page(s), 4/8/1982)
- ML20127M673 - Submits cost estimates for various categories of containment safety margins program from FY80 through Apr of FY84,per request. (4 page(s), 5/24/1984)
- ML20127M656 - "Containment Safety Margins Program," monthly ltr rept for Mar & Apr 1984. (5 page(s), 5/22/1984)
- ML20127M352 - "Containment Integrity Program," monthly rept for Jan 1983. (5 page(s), 2/23/1983)
- ML20127M545 - Submits short description of initial testing of Model SC-2 on 830721-22.Possible leak detected during attempt to raise pressure to 120 psig.Model will be repaired at test site. (4 page(s), 8/2/1983)
- ML20127M355 - "Containment Integrity Program," monthly rept for Feb 1983. (5 page(s), 3/21/1983)
- ML20127M859 - "Containment Safety Margins Program," monthly ltr rept for Aug & Sept 1984. (8 page(s), 10/18/1984)
- ML20127M092 - Requests addl funding for FY82 for separate study into base shear failure modes.Forwards RFP for sidewall-base mat interaction of concrete containments. (6 page(s), 5/3/1982)