Home > NRC Library > ADAMS Public Documents
Provides response to request for addl info re GL 87-02, "Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,USI A-46."
Accession Number: ML18067A780
Date Released: Wednesday, October 31, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18067A779 - Provides response to request for addl info re GL 87-02, "Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,USI A-46." (16 page(s), 11/14/1997)
- ML18067A782 - Discusses generic issue included in NRC requests for addl info on use of GIP Method A.Encl 1 provides basis for position. (48 page(s), 6/30/1997)
- ML18067A783 - "CPC Palisades Plant,Auxiliary Building Job 5935,Seismic Analysis." (40 page(s), 7/31/1969)
- ML18067A784 - "CPC Palisades Plant,Reactor Building Job 5935,Seismic Analysis." (41 page(s), 6/30/1969)
- ML18067A785 - Submits response to NRC RAI on latteral load ductility evaluation of cable tray supports.Approach thoroughly reviewed & accepted by NRC staff in supplemental SER, providing listed staff position. (2 page(s), 6/11/1997)