Home > NRC Library > ADAMS Public Documents
2/22/18 Summary of Public Meeting Between NRC and the NEI.
Accession Number: ML18067A300
Date Released: Wednesday, March 14, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18067A389 - February 22, 2018, Summary of Public Teleconference to Discuss Proposed Revisions to the Fire Protection Significance Determination Process. (3 page(s), 3/14/2018)
- ML17089A417 - IMC 0609 App F DRAFT Fire Protection Significance Determination Process. (44 page(s), 10/11/2017)
- ML17089A418 - IMC 0609 App F Att 1 DRAFT Fire Protection Significance Determination Process Worksheet. (26 page(s), 10/11/2017)
- ML17089A419 - IMC 0609 App F Att 2 DRAFT Degradation Rating Guidance. (10 page(s), 10/11/2017)
- ML17089A420 - IMC 0609 App F Att 3 DRAFT Guidance for Identifying Credible Fire Scenarios. (14 page(s), 10/11/2017)
- ML17089A421 - IMC 0609 App F Att 4 DRAFT Guidance for Determining Fire Ignition Frequency. (9 page(s), 10/11/2017)
- ML17089A422 - IMC 0609 App F Att 5 DRAFT Characterizing Fire Ignition Sources. (9 page(s), 10/11/2017)
- ML17089A423 - IMC 0609 App F Att 6 DRAFT Guidance for the Identification of Targets and Their Ignition and Damage Criteria. (5 page(s), 10/11/2017)
- ML17089A425 - IMC 0609 App F Att 7 DRAFT Guidance for Fire Non-Suppression Probability Analysis. (19 page(s), 10/11/2017)
- ML17089A426 - IMC 0609 App F Att 8 DRAFT Tables and Plots Supporting the Phase 2 Risk Quantification. (157 page(s), 10/11/2017)
- ML17144A273 - IMC 0308 Att 3 App F DRAFT Technical Basis Fire Protection Significance Determination Process (Supplemental Guidance for Implementing IMC 0609 Appendix F) at Power Operations. (122 page(s), 10/11/2017)
- ML18012A673 - Nuclear Energy Institute - Industry Comments on Revisions to IMC 0609, Appendix F, Fire Protection Significance Determination Process. (4 page(s), 1/12/2018)
- ML18029A501 - NRC Response to NEI Comments on Fire Protection SDP Revision - IMC 0609 Appendix F. (5 page(s), 1/23/2018)
- ML18052B065 - 02/22/2018 Discussion of Industry Comments on Revisions to the Fire Protection Significance Determination Process (2 page(s), 2/21/2018)