NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards LER-92-031-01 re inadvertent ESF actuation caused by inadequate test procedures.Original corrective action to revise test connection drawings no longer required because plant procedures revised in such detail to eliminate need.

Accession Number: ML18059A857

Date Released: Wednesday, October 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer