NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 5 to updated FSAR for plant.Rev accurately incorporates all changes to plant or procedures,except for Figure 12-1 which requires mod to reflect current organization.Changes,per 10CFR50.59,listed.

Accession Number: ML18053A638

Date Released: Tuesday, March 2, 2021

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer