Home > NRC Library > ADAMS Public Documents
Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10.
Accession Number: ML18053A189
Date Released: Wednesday, February 28, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17157B265 - Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10. (18 page(s), 5/9/2017)
- ML17157B264 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, List of Current Pages and Master Table of Contents. (56 page(s), 5/9/2017)
- ML17157B243 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant. (725 page(s), 5/9/2017)
- ML17157B238 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Appendices 3A through 3I. (111 page(s), 5/9/2017)
- ML17157B256 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 4, Reactor. (147 page(s), 5/9/2017)
- ML17157B258 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems. (302 page(s), 5/9/2017)
- ML17157B241 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5A. (50 page(s), 5/9/2017)
- ML17157B239 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 6, Engineered Safety Features, Appendices 6A thru 6C. (104 page(s), 5/9/2017)
- ML17157B260 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 7, Instrumentation and Controls. (681 page(s), 5/9/2017)
- ML17157B261 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 8, Electric Power. (232 page(s), 5/9/2017)
- ML17157B244 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 10, Steam and Power Conversion System. (123 page(s), 5/9/2017)
- ML17157B245 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 11, Radioactive Waste Management. (239 page(s), 5/9/2017)
- ML17157B247 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 13, Conduct of Operation. (40 page(s), 5/9/2017)
- ML17157B236 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Appendices 13A - 13L. (12 page(s), 5/9/2017)
- ML17157B248 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 14, Initial Test Program. (237 page(s), 5/9/2017)
- ML17157B249 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 15, Accident Analyses. (469 page(s), 5/9/2017)
- ML17157B250 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 16, Technical Specifications. (3 page(s), 5/9/2017)
- ML17157B251 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 17, Quality Assurance. (12 page(s), 5/9/2017)
- ML17157B252 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 18, Human Factors Engineering. (13 page(s), 5/9/2017)
- ML17157B242 - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Appendix A - License Renewal Final Safety Analysis Report Supplement. (82 page(s), 5/9/2017)
- ML17164A314 - Enclosures 1 & 2: PSEG Nuclear, LLC Quality Assurance Topical Report, NO-AA-10, Revision 86. (144 page(s), 2/24/2017)
- ML17164A315 - Enclosure 3: Hope Creek Generating Station Technical Specification Bases As of May 9, 2017. (126 page(s), 5/9/2017)
- ML18044A000 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Appendices 15A - 15D. (106 page(s), 5/9/2017)
- ML18044A001 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Appendices 9A and 9B Comparison. (560 page(s), 5/9/2017)
- ML18044A002 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 12, Radiation Protection. (556 page(s), 5/19/2017)
- ML18044A003 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 2, Site Characteristics. (969 page(s), 5/9/2017)
- ML18044A005 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 through 3.5. (328 page(s), 5/9/2017)
- ML18044A004 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.6 through 3.11. (993 page(s), 5/9/2017)
- ML18044A006 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 6, Engineered Safety Features. (696 page(s), 5/9/2017)
- ML18044A007 - Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 9, Auxiliary Systems. (1048 page(s), 5/9/2017)