Home > NRC Library > ADAMS Public Documents
Requests extension of one operating cycle beyond present commitment of 1985 refueling outage to make mods per SEP Topic XV-2, "Spectrum of Steam Piping Failures Inside & Outside Containment (PWR)."
Accession Number: ML18051A543
Date Released: Wednesday, October 31, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18051A542 - Requests extension of one operating cycle beyond present commitment of 1985 refueling outage to make mods per SEP Topic XV-2, "Spectrum of Steam Piping Failures Inside & Outside Containment (PWR)." (4 page(s), 8/15/1983)
- ML18051A544 - "Evaluation of Palisades MSIV Single-Failure Backfit." (51 page(s), 8/15/1983)
- ML18051A545 - "Operating Procedures Review." (3 page(s), 8/15/1983)
- ML18051A546 - Rev 14 to Emergency Operating Procedure EOP 1, "Reactor Trip." (5 page(s), 8/15/1983)
- ML18051A547 - Rev 14 to Emergency Operating Procedure EOP 6, "Main Steam Line Break/Main Feedwater Line Break Inside Containment." (9 page(s), 8/15/1983)
- ML18051A549 - Rev 13 to Emergency Operating Procedure EOP 7, "Main Steam Line Break/Main Feedwater Line Break Outside Containment." (6 page(s), 8/15/1983)
- ML18051A550 - Rev 15 to Emergency Operating Procedure EOP 8.1, "LOCA." (16 page(s), 8/15/1983)
- ML18051A551 - Rev 14 to Emergency Operating Procedure EOP 8.2, "Steam Generator Tube Rupture." (15 page(s), 8/15/1983)
- ML18051A552 - "Steam Generator/Auxiliary Feedwater Review." (15 page(s), 8/15/1983)