Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 3 and 4 - Issuance of Amendment Nos. 114 and 113 and Exemptions - Reactor Vessel Head Vent Capacity (LAR-17-025)
Accession Number: ML18045A183
Date Released: Friday, March 16, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18045A185 - Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4 - Reactor Vessel Head Vent Capacity LAR-17-025 (5 page(s), 3/8/2018)
- ML18045A186 - Amendment No. 114 - Vogtle Electric Generating Plant Unit 3 LAR-17-025 (2 page(s), 3/8/2018)
- ML18051A668 - Attachment - Vogte Electric Generating Plant Unit 3 Amendment 114 (LAR-17-025) (3 page(s), 3/8/2018)
- ML18045A187 - Amendment No. 113 - Vogtle Electric Generating Plant Unit 4 LAR-17-025 (3 page(s), 3/8/2018)
- ML18051A676 - Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 113 (LAR-17-025) (3 page(s), 3/8/2018)
- ML18045A188 - Exemption - Vogtle Electric Generating Plant Unit 3 LAR-17-025 (2 page(s), 3/8/2018)
- ML18045A189 - Exemption - Vogtle Electric Generating Plant Unit 4 LAR-17-025 (2 page(s), 3/8/2018)
- ML18045A190 - Safety Evaluation - Vogtle Electric Generating Plant, Units 3 and 4 LAR-17-025 (9 page(s), 3/8/2018)