Home > NRC Library > ADAMS Public Documents
Forwards util program to meet requirements of IE Bulletins 79-02 & 79-14,consolidating various analyses for future SEP & ensuring consistency w/drawings.Some Seismic Category I piping does not meet FSAR requirements.
Accession Number: ML18044A534
Date Released: Wednesday, November 6, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18044A533 - Forwards util program to meet requirements of IE Bulletins 79-02 & 79-14,consolidating various analyses for future SEP & ensuring consistency w/drawings.Some Seismic Category I piping does not meet FSAR requirements. (4 page(s), 2/14/1980)
- ML18044A536 - "Rept on Insp & Testing Program for Concrete Expansion Anchors per IE Bulletin 79-02 & Revisions for CPC Facility in South Haven,MI." (4 page(s), 2/11/1980)
- ML18044A539 - "Results of Insp & Testing Program in Response to IE Bulletin 79-02 & Revisions (for Interim Plant Operations) for CPC Facility in South Haven,MI," Revision 0. (8 page(s), 2/11/1980)
- ML18044A540 - "Results & Evaluation of Tests on Phillips "Red Head" Self- Drilling Expansion Anchors for CPC Facility in South Haven, MI." (86 page(s), 1/31/1980)
- ML19296B317 - Proposed amend to License DPR-20 incorporating plant mods necessary to ensure that Seismic Category I piping meets FSAR criteria. (1 page(s), 2/13/1980)