Home > NRC Library > ADAMS Public Documents
Forwards list as well as correspondence submitted by TVA to NRC which may not have reached DCD.
Accession Number: ML18038B503
Date Released: Friday, April 17, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18038B502 - Forwards list as well as correspondence submitted by TVA to NRC which may not have reached DCD. (7 page(s), 11/3/1995)
- ML18038B504 - Forwards two requested Individual Plant Evaluations performed for TVA by Westinghouse & requests meeting w/NRC to provide TVA detailed comments on NUREG-1150.W/o encls. (2 page(s), 3/18/1987)
- ML18038B505 - Confirms 870916 telcon,during which SA White informed NRC of intent to initiate activities at Sequoyah Nuclear Plant Unit 2 leading to nonnuclear heatup of plant sys. (4 page(s), 9/28/1987)
- ML18038B506 - Discusses 871021 ltr by which Messrs,Christie,Lau & Proctor of TVA Sys Engineering Branch wrote to NRC charging that TVA intentionally provided misleading info re Brown Ferry PRA to NRC. (4 page(s), 12/1/1987)
- ML18038B507 - Confirms conversation that HL Abercrombie,voluntarily retiring from TVA,effective 880722. (4 page(s), 7/20/1988)
- ML18038B508 - Forwards response to questions re use of reconstituted fuel in Brown Ferry Unit 2,Cycle 6. (23 page(s), 2/11/1991)
- ML18038B509 - Notifies of listed RO license status change for TR Fraley. (3 page(s), 7/1/1991)
- ML20094F131 - Notifies that TVA determined that effective 910624, MB Williams no longer need to maintain SRO license SOP-20871 for plant. (1 page(s), 7/16/1991)
- ML18038B510 - Forwards white paper, "Sequoyah Nuclear Plant Resolution of Pressurizer Safety Valve Seat Leakage Concerns," in follow-up to earlier discussions re SRV leakage experience at plant. (4 page(s), 11/27/1991)
- ML18038B511 - "Sequoyah Nuclear Plant Resolution of Pressurizer Safety Valve Seat Leakage Concerns." (22 page(s), 11/14/1991)
- ML18038B512 - Forwards update to 850318 ltr for Sequoyah Nuclear Plant Unit 2 as requested in NRC/TVA 880429 meeting re performance testing of reactor relief & safety valves. (4 page(s), 6/24/1988)