NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards LER 95-005 re failure of BFN Unit 2 HPCIS during testing.Event reported per 10CFR50.73(a)(2)(v),as condition alone could have prevented fulfillment of safety function of structure or sys needed to mitigate consequences.

Accession Number: ML18038B323

Date Released: Thursday, September 27, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer