NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards rev 1 to LER 94-013 re Unit 2 scram that occurred as result of failure due to setpoint drift in stator cooling water temp switch.Rev reflects addl actions being taken to evaluate other balance of plant devices.

Accession Number: ML18038B111

Date Released: Thursday, September 27, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer