NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Reactor Containment Bldg Integrated Leak Rate Test Browns Ferry Nuclear Plant Unit 2 Conducted on 910317-18." Test performed to demonstrate continuing leak-tight integrity of reactor bldg primary containment.

Accession Number: ML18033B729

Date Released: Saturday, April 4, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer