NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Control of Heavy Loads at Nuclear Power Plants, Shearon Harris Nuclear Power Plant Units 1 & 2," draft technical evaluation rept.Telcon to resolve open items requested.

Accession Number: ML18018B836

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer