Home > Site Help > Search Results

Forwards rev 1 to SHNPP Cycle 9 COLR.Rev 1 revises movable incore detection sys operability requirements to specify that at least 44 detector thimbles are required at beginning of fuel cycle.

Accession Number: ML18016A740

Date Released: Friday, August 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer