NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 0 to "Harris Nuclear Plant Cycle 8 COLR." Rev incorporates changes necessary as result of Cycle 8 core changes & to remove Cycle 7 temporary relaxation of min required of detector thimbles in MICDS.

Accession Number: ML18012A770

Date Released: Friday, August 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer