NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards SER re use of safety injection pumps rather than charging pumps for 10CFR50,app R requirements for Turkey Point,Units 3 & 4 & concludes that evaluation of adequacy of fire protection features necessary.

Accession Number: ML17354A691

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer