NRC Logo

Home > NRC Library > ADAMS Public Documents

Discusses util request to update requirements for sys pressure tests & extend existing 10-year insp interval due to lengthy steam generator repair outages.Extension unacceptable.Update of test requirements acceptable.

Accession Number: ML17346A224

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer