This package has no contents NRC: Package ML17341A864 - Forwards 150-day response to NRC 810821 & 1218 questions re pressurized thermal shock to reactor pressure vessels. Emergency Operating Procedure 20002 (E-2), "Loss of Secondary Coolant," encl.Reactor integrity demonstrated.

Home > Site Help > Search Results

Forwards 150-day response to NRC 810821 & 1218 questions re pressurized thermal shock to reactor pressure vessels. Emergency Operating Procedure 20002 (E-2), "Loss of Secondary Coolant," encl.Reactor integrity demonstrated.

Accession Number: ML17341A864

Date Released: Tuesday, July 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer