Second motion for summary disposition of Contentions 2 & 6. No documents or evidence exist establishing genuine dispute as to matl facts.Dismissal of contentions is warranted as a matter of law.
Accession Number: ML17340A884
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17340A883 - Second motion for summary disposition of Contentions 2 & 6. No documents or evidence exist establishing genuine dispute as to matl facts.Dismissal of contentions is warranted as a matter of law. (20 page(s), 3/23/1981)
- ML17340A885 - Affidavit re Contention 2.Licensee workforce is sufficent to satisfactorily & safely perform necessary repair activities. Licensee proposed programs & procedures for steam generator repairs meet requirements.W/prof qualifications. (14 page(s), 3/10/1981)
- ML17340A886 - Affidavit re Contention 2.In applying ALARA concept,NRC uses qualitative,programmatic approach rather than imposing quantitative operating limit.Prof qualifications encl. (26 page(s), 3/19/1981)
- ML17340A887 - Affidavit re Contentions 6(a),(b),(c) & (e).Storage structure will be located at elevation of 17.5 feet mean low water.Design basis flood would not cause significant immersion of steam generators.Prof qualifications encl. (12 page(s), 3/11/1981)
- ML17340A888 - Affidavit re Contention 6(d).Probability of through-wall corrosion crack is so small as to be insignificant.Seal welds required to be coated w/varnish to assure no ingress of oxygen through seal weld.Prof qualifications encl. (8 page(s), 3/9/1981)
- ML17340A889 - Affidavit re Contention 6(e).Risk of leakage of radioactive matl from storage facility is effectively eliminated w/ applicant provision of concrete floor.Steam generator assemblies may be stored in bldg.W/Certificate of Svc. (10 page(s), 3/12/1981)