NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Engineering Evaluation of Feedwater Transient & Sys Pipe Break at Turkey Point Unit 3 on 801119," per request.Mulitple failures of Capes-Vulcan feedwater valves lead to flow instabilities & subsequent reactor trips.

Accession Number: ML17340A851

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer