NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation accepting plant design,per Reg Guide 1.97,Rev 3 w/exception of instrumentation w/wide-range steam generator level.Proposed plans & schedule for implementing instrumentation requested within 30 days.

Accession Number: ML17328A145

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer