Fifth partial response to FOIA request for documents re plant.App C & encl App D documents available in PDR.
Accession Number: ML17325B782
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17325B781 - Fifth partial response to FOIA request for documents re plant.App C & encl App D documents available in PDR. (19 page(s), 3/18/1987)
- ML20207S840 - Notification of 840702 meeting w/licensee in Bethesda,MD to discuss util submittal on piping & supports.List of attendees,meeting agenda & related documentation encl. (30 page(s), 6/26/1984)
- ML20207S884 - Handwritten memo forwarding list of allegations for review. Identification of allegations in scope of recipient review & of which allegations must be resolved prior to full power requested. (1 page(s), 7/8/1984)
- ML20204G589 - Comments on gas & solid debris formation from zinc,aluminum & organic matls inside containment under DBA conditions. Paints not meeting provisions of Reg Guide 1.54 can be sources of hydrogen generation & debris formation. (4 page(s), 2/27/1984)
- ML20204G603 - Forwards affidavit & response to Allegation 177 by CY Liang & affidavit of F Rosa re affidavit of JH Cooper & Allegation 177.Encls provide input to NRC response to Joint Intervenor 840214 motion to augment or reopen record. (1 page(s), 3/15/1984)
- ML20204G660 - Summarizes 840521-25 site visit to util ofcs in San Francisco,CA & facility re audit of 50 TC packages & 25 DP packages,including original design,authorized changes,as- builts & final calculations re License Condition 6. (6 page(s), 5/30/1984)
- ML20207S758 - Requests any new info for status rept on all outstanding allegations re plant prior to authorization of criticality & low power testing,per Commission direction.Info requested by 831216. (4 page(s), 12/14/1983)
- ML20207S803 - Forwards Div of Engineering plan for resolution of issues re design of piping.Staff & licensee actions necessary to close out seven piping-related license conditions outlined. Related documentation encl. (21 page(s), 4/27/1984)
- ML20207S747 - Informs of status of facility component cooling water sys. Issue of appropriate intake temp to be used in post-accident heat removal analysis for assuring equipment operation unresolved. (3 page(s), 6/14/1983)
- ML20204G482 - Discusses adequacy of design of component cooling water sys.Environ & Hydrologic Engineering Branch should review basis for 64 F max ocean water temp. (2 page(s), 5/12/1983)
- ML20204G606 - Requests addl info re containment protective coatings based on review of FSAR Section 6.2,util 840124 ltr & Spec 8848. Review conducted in response to Allegation 100.Licensee response requested by 840415. (2 page(s), 3/26/1984)
- ML20204G646 - Provides reevaluated estimate of solid debris formation from unqualified paints inside containment under DBA conditions. Estimate of 840509 reduced from 6,400 lb to 500 lb due to util proof that paints used in containment NRC approved. (2 page(s), 5/18/1984)
- ML20204G695 - Discusses Allegation 100 re solid debris from unqualified paints inside containment.SER,concluding operation w/potential to generate 3 cubic ft of solid debris, acceptable.SALP input also encl. (2 page(s), 6/29/1984)
- ML20204G701 - Submits list of issues to be provided to util for consideration & discussion at forthcoming meeting covering rigid-to-rigid restraints & anchors & IDVP. (2 page(s), 6/13/1984)
- ML20207S831 - Informs that listed recipient activities will complete NRR-Region V request for assistance in review of allegations for facility.Participation in review of IDVP piping activities scheduled for 840424 requested. (4 page(s), 6/19/1984)
- ML20244D033 - Forwards inputs to SSER 24,including staff evaluation of 840202 petition filed by Govt Accountability Project Inst for Policy Studies & updated info on Allegations 39 & 45. SALP input encl. (25 page(s), 7/10/1984)
- ML20207S871 - Requests draft SER re piping review activities by 840706 in addition to other actions requested in 840629 memo. Outstanding issues should be identified. (1 page(s), 6/29/1984)
- ML20207S787 - Requests review of encl Allegations 203-210.Evaluation of impact on low power operation requested by 840323.Related documentation encl. (20 page(s), 3/22/1984)
- ML20207S856 - SER re Allegation 100 on solid debris from unqualified paints inside containment.Debris will not have significant adverse effect on operability of containment sump & associated safety sys. (2 page(s), 6/29/1984)