Home > NRC Library > ADAMS Public Documents
Forwards SER & Technical Evaluation Rept EGG-NTA-7458 on Generic Ltr 83-28,Item 4.5.2 re online testing of reactor trip sys,including independent testing of undervoltage & shunt trip attachments.Action complete.
Accession Number: ML17324B264
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17324B263 - Forwards SER & Technical Evaluation Rept EGG-NTA-7458 on Generic Ltr 83-28,Item 4.5.2 re online testing of reactor trip sys,including independent testing of undervoltage & shunt trip attachments.Action complete. (1 page(s), 3/3/1987)
- ML17324B265 - SER supporting licensee response to Generic Ltr 83-28,Item 4.5.2 re reactor trip sys reliability,including requirement for online functional testing. (2 page(s), 3/3/1987)
- ML17334B033 - "Input for SER,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28." (32 page(s), 11/30/1986)