Home > NRC Library > ADAMS Public Documents
Forwards ANL preliminary questions developed during review of Exxon repts supporting request for reload review.Meeting scheduled for 840329.
Accession Number: ML17320A970
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17320A969 - Forwards ANL preliminary questions developed during review of Exxon repts supporting request for reload review.Meeting scheduled for 840329. (4 page(s), 3/16/1984)
- ML17320A971 - Forwards first round questions following evaluation of Exxon rept, "Steam Tube Rupture Incident at Prairie Island Unit 1, PTSPWR2 vs Data,Preliminary Benchmark Analysis." (5 page(s), 3/6/1984)
- ML17320A972 - Forwards first round questions on Exxon plant transient code,based on review of proprietary rept, "Description of Exxon Nuclear Plant Transient Simulation Model for PWRs." (9 page(s), 9/30/1983)
- ML17320A973 - Forwards first round questions on mods to Exxon draft repts, "PTSPWR2 Mods for St Lucie Unit 1" & "Description of Exxon Plant Transient Simulation Model for PWRs." (9 page(s), 11/22/1983)
- ML17320A974 - Forwards first round questions on Exxon methodology rept for PTSPWR2.Rept lacks specific details re biases in initial conditions & boundary conditions. (9 page(s), 3/5/1984)